1100MW Grizzly (G10)

1100MW Grizzly is a 1,100.0 MW gas interconnection project in Jefferson, Oregon with a current status of withdrawn. It is proposed to connect at Grizzly 500 kV Substation.

1,100.0 MWCapacity
WithdrawnStatus
ORMarket
GasTechnology

Project facts

Canonical name1100MW Grizzly
Queue IDG10
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyGas
Capacity1,100.0 MW
StateOregon
CountyJefferson
Point of interconnectionGrizzly 500 kV Substation
Requested (queue) date2000-08-28
Proposed in-service date2004-07-01
Operational date
Withdrawn date
DeveloperCogentrix Energy, Inc.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata