1200 MW controllable ETU - unidirectional (1411)

1200 MW controllable ETU - unidirectional is a 1,200.0 MW generation interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource Mystic 345 kV Substation.

1,200.0 MWCapacity
WithdrawnStatus
BOSTMarket
GenerationTechnology

Project facts

Canonical name1200 MW controllable ETU - unidirectional
Queue ID1411
Statuswithdrawn
Source statusW
MarketBOST
TechnologyGeneration
Capacity1,200.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionEversource Mystic 345 kV Substation
Requested (queue) date2023-06-20
Proposed in-service date2032-05-31
Operational date
Withdrawn date2023-08-17
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata