Massachusetts Interconnection Projects
interXdata tracks 1,644 interconnection projects in Massachusetts representing 109,751 MW of requested capacity. The dominant technology by capacity is Battery. The most active counties are Worcester, Hampden, Plymouth.
1,644Total projects
61Active
1,103Operational
464Withdrawn
109,751 MWRequested capacity
10,858 MWActive capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 325 | 27,430 MW |
| Wind | 76 | 27,038 MW |
| Other | 278 | 25,992 MW |
| Gas | 205 | 25,893 MW |
| Solar | 652 | 2,257 MW |
| Solar+Battery | 108 | 1,141 MW |
Counties
| County | Projects | Requested capacity |
|---|---|---|
| Worcester | 349 | 8,825 MW |
| Hampden | 197 | 8,469 MW |
| Plymouth | 154 | 8,005 MW |
| Bristol | 153 | 9,080 MW |
| Middlesex | 146 | 13,272 MW |
| Norfolk | 102 | 8,417 MW |
| Berkshire | 101 | 4,946 MW |
| Franklin | 84 | 3,806 MW |
| Hampshire | 79 | 697 MW |
| Essex | 73 | 3,677 MW |
| Suffolk | 72 | 5,912 MW |
| Barnstable | 68 | 4,027 MW |
| Dukes | 6 | 814 MW |
| Nantucket | 3 | 22 MW |
| Somerset | 2 | 18 MW |
| Suffolk/Barnstable | 2 | 0 MW |
| Franklin And Berkshire | 1 | 0 MW |
| Middlesex/Norfolk | 1 | 17 MW |
| Berkshire & Franklin | 1 | 28 MW |
| Franklin And Bershire | 1 | 0 MW |
| Hampden/Franklin | 1 | 8 MW |
| Wocester | 1 | 153 MW |
| Middlesex/Worcester | 1 | 9 MW |
| Franklin/Hampshire | 1 | 9 MW |
Largest projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| 345 kV AC line | 625 | — | 1,600.0 MW | withdrawn | Bristol, Massachusetts |
| CNR Increase | 474 | Gas | 1,600.0 MW | withdrawn | Middlesex, Massachusetts |
| Offshore wind | 1119 | Wind | 1,320.0 MW | withdrawn | Massachusetts |
| Offshore wind | 1451 | Wind | 1,309.0 MW | withdrawn | Massachusetts |
| Offshore Wind CNR only | 1500 | Wind | 1,249.5 MW | withdrawn | Massachusetts |
| Offshore Wind | 1225 | Wind | 1,200.0 MW | withdrawn | Massachusetts |
| Enable 1200 MW injection at Mystic | 1332 | — | 1,200.0 MW | withdrawn | Massachusetts |
| Somerset Wind Link - 1200 MW HVDC Line (Controllable) into Brayton Point | 837 | — | 1,200.0 MW | active | Bristol, Massachusetts |
| Bay State Wind 4 Offshore Wind | 944 | Wind | 1,200.0 MW | active | Massachusetts |
| Offshore wind | 1121 | Wind | 1,200.0 MW | withdrawn | Massachusetts |
| AC to HVDC Tie | 512 | — | 1,200.0 MW | withdrawn | Middlesex, Massachusetts |
| 1200 MW DC Transmission Line | 1158 | — | 1,200.0 MW | withdrawn | Massachusetts |
| 1200 MW controllable ETU - unidirectional | 1411 | — | 1,200.0 MW | withdrawn | Middlesex, Massachusetts |
| HVDC from ME to MA (MA import only) | 569 | — | 1,200.0 MW | withdrawn | Plymouth, Massachusetts |
| SouthCoast Wind 1 | 1116 | Wind | 1,200.0 MW | active | Massachusetts |
| Offshore Wind | 1059 | Wind | 1,200.0 MW | withdrawn | Massachusetts |
| 1200 MW HVDC Line (controllable) Into Mystic | 873 | — | 1,200.0 MW | withdrawn | Middlesex, Massachusetts |
| Offshore Wind | 1297 | Wind | 1,200.0 MW | withdrawn | Massachusetts |
| 1200 MW DC Transmission Line | 1157 | — | 1,200.0 MW | withdrawn | Massachusetts |
| Offshore Wind | 1343 | Wind | 1,200.0 MW | withdrawn | Massachusetts |
| Northfield Mt. Equipment Replacement | 217 | Other | 1,180.0 MW | operational | Franklin, Massachusetts |
| HVDC Line | 509 | — | 1,100.0 MW | withdrawn | Middlesex, Massachusetts |
| Combined Cycle | 580 | Gas | 1,020.0 MW | withdrawn | Worcester, Massachusetts |
| HVDC Line | 510 | — | 1,000.0 MW | withdrawn | Plymouth, Massachusetts |
| 1000 MW HVDC (import only) | 640 | — | 1,000.0 MW | withdrawn | Plymouth, Massachusetts |
| HVDC from S. Maine to Mystic - bidirectional flow | 517 | — | 1,000.0 MW | withdrawn | Middlesex, Massachusetts |
| HVDC from S. Maine to K Street - bidirectional fl | 518 | — | 1,000.0 MW | withdrawn | Suffolk, Massachusetts |
| Internal HVDC - North to South flow | 506 | — | 1,000.0 MW | withdrawn | Suffolk, Massachusetts |
| HVDC Line | 511 | — | 1,000.0 MW | withdrawn | Barnstable, Massachusetts |
| HVDC Tie NB to Mystic | 585 | — | 900.0 MW | withdrawn | Middlesex, Massachusetts |
Top developers in Massachusetts
Developer attribution is not yet resolved for this set.
Recent material changes
| Observed | Project | Field | Old | New |
|---|---|---|---|---|
| 2026-11-01 | MA Acushnet 540R Main St | proposed_online_date | 2027-03-01 | 2027-06-01 |
| 2026-11-01 | MA Acushnet 540R Main St | proposed_online_date | 2027-03-01 | 2027-06-01 |
| 2026-11-01 | Taft BESS | proposed_online_date | 2027-02-01 | 2027-04-01 |
| 2026-11-01 | Belchertown Solar PV + Battery Project | new_project | — | active |
| 2026-11-01 | Belchertown Solar PV + Battery Project | new_project | — | active |
| 2026-11-01 | Ipswich MA BESS 1 | proposed_online_date | 2026-10-01 | 2026-11-01 |
| 2026-11-01 | Holyoke MA BESS 1 | proposed_online_date | 2026-09-01 | 2026-10-01 |
| 2026-11-01 | AbbieVie, Inc. - Worcester, MA | new_project | — | operational |
| 2026-11-01 | UE-02601MA, LLC | new_project | — | operational |
| 2026-11-01 | UE-02601MA, LLC | new_project | — | operational |
| 2026-11-01 | Energizar BESS | proposed_online_date | 2027-09-01 | 2027-12-01 |
| 2026-10-02 | Solar Carver 1 Hybrid | proposed_online_date | 2026-09-01 | 2026-10-01 |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-11-26
Page data generated2026-11-26
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.