1200 MW HVDC Line (controllable) Into Mystic (873)

1200 MW HVDC Line (controllable) Into Mystic is a 1,200.0 MW generation interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at The proposed point of Interconnection is: NSTAR Mystic 345kV Substation.

1,200.0 MWCapacity
WithdrawnStatus
BOSTMarket
GenerationTechnology

Project facts

Canonical name1200 MW HVDC Line (controllable) Into Mystic
Queue ID873
Statuswithdrawn
Source statusW
MarketBOST
TechnologyGeneration
Capacity1,200.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionThe proposed point of Interconnection is: NSTAR Mystic 345kV Substation
Requested (queue) date2019-04-04
Proposed in-service date2024-08-01
Operational date
Withdrawn date2020-07-02
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata