1200 MW HVDC Line into Singer (Controllable) (899)

1200 MW HVDC Line into Singer (Controllable) is a 1,200.0 MW generation interconnection project in Fairfield, Connecticut with a current status of withdrawn. It is proposed to connect at The proposed point of interconnection is 345kV Singer substation in Bridgeport, CT..

1,200.0 MWCapacity
WithdrawnStatus
SWCTMarket
GenerationTechnology

Project facts

Canonical name1200 MW HVDC Line into Singer (Controllable)
Queue ID899
Statuswithdrawn
Source statusW
MarketSWCT
TechnologyGeneration
Capacity1,200.0 MW
StateConnecticut
CountyFairfield
Point of interconnectionThe proposed point of interconnection is 345kV Singer substation in Bridgeport, CT.
Requested (queue) date2019-07-29
Proposed in-service date2024-09-01
Operational date
Withdrawn date2020-07-31
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata