Connecticut Interconnection Projects

interXdata tracks 2,433 interconnection projects in Connecticut representing 58,903 MW of requested capacity. The dominant technology by capacity is Gas. The most active counties are Capitol Planning Region, Western Connecticut Planning Region, South Central Connecticut Planning Region.

2,433Total projects
556Active
1,637Operational
235Withdrawn
58,903 MWRequested capacity
1,647 MWActive capacity

Technology mix

TechnologyProjectsRequested capacity
Gas20621,715 MW
Other17714,878 MW
Wind1210,220 MW
Battery1,8699,535 MW
Solar1642,333 MW
Solar+Battery5223 MW

Counties

Largest projects

ProjectQueue IDTechnologyCapacityStatusLocation
Non-controllable objective ETU to enable 2400 MW injection1569—2,400.0 MWwithdrawnNew London, Connecticut
1400 MW HVDC Line into Millstone891—1,400.0 MWwithdrawnNew London, Connecticut
Millstone566_3Other1,350.0 MWoperationalNew London, Connecticut
Offshore Wind1488Wind1,275.0 MWwithdrawnConnecticut
Offshore Wind1505Wind1,275.0 MWwithdrawnConnecticut
Non-controllable objective ETU to enable additional 1200 MW (to QP1309) injection near Millstone sub1435—1,200.0 MWwithdrawnNew London, Connecticut
Offshore Wind Increase1060Wind1,200.0 MWwithdrawnConnecticut
non-controllable objective ETU to enable 1200 MW injection near Millstone substation1309—1,200.0 MWwithdrawnNew London, Connecticut
Offshore Wind1058Wind1,200.0 MWwithdrawnConnecticut
Offshore Wind927Wind1,200.0 MWwithdrawnConnecticut
Offshore Wind CNR1485Wind1,200.0 MWwithdrawnConnecticut
Offshore Wind893Wind1,200.0 MWwithdrawnConnecticut
1200 MW HVDC Line into Singer (Controllable)899—1,200.0 MWwithdrawnFairfield, Connecticut
Combined Cycle596Gas1,120.0 MWwithdrawnWindham, Connecticut
2400 controllable ETU - unidirectional1333—1,100.0 MWwithdrawnConnecticut
Millstone566_2Other909.9 MWoperationalNew London, Connecticut
Millstone 2 Upgrade799Other897.5 MWoperationalNew London, Connecticut
Lake Road CNR Only (see Q534)604Gas882.0 MWoperationalWindham, Connecticut
Offshore Wind791Wind805.0 MWwithdrawnConnecticut
Offshore Wind792Wind805.0 MWwithdrawnConnecticut
Combined Cycle369Gas745.0 MWwithdrawnFairfield, Connecticut
CPV Towantic Energy Center384Gas745.0 MWoperationalNew Haven, Connecticut
Combined Cycle277Gas695.0 MWwithdrawnFairfield, Connecticut
Combined Cycle388Gas680.0 MWwithdrawnFairfield, Connecticut
NTE Connecticut724Gas672.0 MWwithdrawnWindham, Connecticut
Kleen Energy Project95Gas619.8 MWoperationalMiddlesex, Connecticut
Bridgeport Energy PSS Tuning595Gas578.0 MWoperationalFairfield, Connecticut
Combined Cycle598Gas563.0 MWwithdrawnWindham, Connecticut
Meriden Gas Turbines222Gas510.0 MWwithdrawnNew Haven, Connecticut
PSEG Bridgeport Harbor CCGT Expansion412Gas509.6 MWoperationalFairfield, Connecticut

Top developers in Connecticut

Recent material changes

ObservedProjectFieldOldNew
2026-10-02Groton Flanders Road Landfillnew_project—active
2026-09-02Putnam Meadow Solar Stationproposed_online_date2027-01-012027-03-01

Explore related data

Source last checked2026-07-31
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: ct-ess-storage; U.S. EIA — Form EIA-860M generator inventory (operating + planned); isone-irtt; New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get notified when a new project appears in Connecticut.

Start tracking with interXdata