138kV bus at Red Point Substation is a 100.0 MW solar interconnection project in Bossier, Louisiana with a current status of withdrawn. It is proposed to connect at 138kV bus at Red Point Substation.

100.0 MWCapacity
WithdrawnStatus
LAMarket
SolarTechnology

Project facts

Canonical name138kV bus at Red Point Substation
Queue IDGEN-2021-104
Statuswithdrawn
Source statusWITHDRAWN
MarketLA
TechnologySolar
Capacity100.0 MW
StateLouisiana
CountyBossier
Point of interconnection138kV bus at Red Point Substation
Requested (queue) date2021-05-26
Proposed in-service date2027-10-19
Operational date
Withdrawn date2024-02-28
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata