Bossier County, Louisiana — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Bossier, Louisiana, representing 1,425 MW of requested capacity.
4Total projects
1Active
0Operational
3Withdrawn
1,425 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 1,100 MW |
| Battery | 1 | 325 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Longwood to Sarepta 345 kV Line Tap | GEN-2022-052 | Solar | 850.0 MW | withdrawn | Bossier, Louisiana |
| Longwood to Sarepta 345 kV Line Tap | GEN-2022-051 | Battery | 325.0 MW | withdrawn | Bossier, Louisiana |
| Red Pointe 138 kV Substation | GEN-2023-230 | Solar | 150.0 MW | active | Bossier, Louisiana |
| 138kV bus at Red Point Substation | GEN-2021-104 | Solar | 100.0 MW | withdrawn | Bossier, Louisiana |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.