1400 MW HVDC Line into Millstone (891)

1400 MW HVDC Line into Millstone is a 1,400.0 MW generation interconnection project in New London, Connecticut with a current status of withdrawn. It is proposed to connect at The proposed point of Interconnection is the Eversource Millstone 345kV substation in Waterford, CT - Alternate is Haddam 345 kV Substation.

1,400.0 MWCapacity
WithdrawnStatus
CTMarket
GenerationTechnology

Project facts

Canonical name1400 MW HVDC Line into Millstone
Queue ID891
Statuswithdrawn
Source statusW
MarketCT
TechnologyGeneration
Capacity1,400.0 MW
StateConnecticut
CountyNew London
Point of interconnectionThe proposed point of Interconnection is the Eversource Millstone 345kV substation in Waterford, CT - Alternate is Haddam 345 kV Substation
Requested (queue) date2019-05-29
Proposed in-service date2024-03-01
Operational date
Withdrawn date2020-01-16
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata