161 kV line tap of DELL EAST to Blytheville (J2051)

161 kV line tap of DELL EAST to Blytheville is a 50.0 MW battery interconnection project in Mississippi, Arkansas with a current status of withdrawn. It is proposed to connect at 161 kV line tap of DELL EAST to Blytheville.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical name161 kV line tap of DELL EAST to Blytheville
Queue IDJ2051
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateArkansas
CountyMississippi
Point of interconnection161 kV line tap of DELL EAST to Blytheville
Requested (queue) date2021-11-23
Proposed in-service date2024-10-30
Operational date2024-10-30
Withdrawn date2023-11-10
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.