Arkansas Interconnection Projects
interXdata tracks 761 interconnection projects in Arkansas representing 121,956 MW of requested capacity. The dominant technology by capacity is Solar. The most active counties are Mississippi, Jefferson, Pulaski.
761Total projects
39Active
317Operational
396Withdrawn
121,956 MWRequested capacity
7,728 MWActive capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 469 | 77,307 MW |
| Gas | 87 | 15,473 MW |
| Other | 88 | 12,609 MW |
| Battery | 87 | 10,141 MW |
| Wind | 24 | 4,415 MW |
| Solar+Battery | 5 | 1,981 MW |
| Solar+Gas | 1 | 30 MW |
Counties
| County | Projects | Requested capacity |
|---|---|---|
| Mississippi | 48 | 13,677 MW |
| Jefferson | 32 | 8,124 MW |
| Pulaski | 32 | 1,451 MW |
| Union | 28 | 7,570 MW |
| Craighead | 26 | 4,238 MW |
| Jackson | 24 | 6,104 MW |
| Washington | 22 | 489 MW |
| Crittenden | 21 | 4,284 MW |
| Arkansas | 20 | 2,440 MW |
| Cross | 19 | 2,688 MW |
| Lonoke | 19 | 3,252 MW |
| Hot Spring | 18 | 5,240 MW |
| Lee | 18 | 3,473 MW |
| Phillips | 15 | 2,583 MW |
| Franklin | 15 | 938 MW |
| Greene | 15 | 698 MW |
| Clay | 14 | 1,258 MW |
| Little River | 12 | 1,257 MW |
| Ouachita | 12 | 1,509 MW |
| Hempstead | 12 | 2,467 MW |
| Pope | 11 | 3,306 MW |
| Poinsett | 11 | 1,891 MW |
| Ashley | 11 | 971 MW |
| Chicot | 11 | 1,855 MW |
| Columbia | 10 | 1,777 MW |
| Calhoun | 10 | 3,466 MW |
| White | 10 | 709 MW |
| Grant | 10 | 1,220 MW |
| St. Francis | 9 | 1,372 MW |
| Clark | 9 | 776 MW |
| Independence | 9 | 2,961 MW |
| Desha | 8 | 545 MW |
| Marion | 8 | 340 MW |
| Monroe | 8 | 930 MW |
| Crittenden County | 7 | 1,150 MW |
| Benton | 7 | 1,261 MW |
| Nevada | 6 | 1,093 MW |
| Crawford | 6 | 384 MW |
| Conway | 6 | 417 MW |
| Prairie | 6 | 777 MW |
Largest projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| MISO Queue Project J433 — Gas in Union, Arkansas | J433 | Gas | 1,270.0 MW | withdrawn | Union, Arkansas |
| MISO Queue Project J376 — Gas in Union, Arkansas | J376 | Gas | 1,270.0 MW | operational | Union, Arkansas |
| Arkansas Nuclear One | 8055_2 | Other | 942.5 MW | operational | Pope, Arkansas |
| Arkansas Nuclear One | 8055_1 | Other | 902.5 MW | operational | Pope, Arkansas |
| White Bluff | 6009_2 | Other | 900.0 MW | operational | Jefferson, Arkansas |
| Independence Steam Electric Station | 6641_2 | Other | 900.0 MW | operational | Independence, Arkansas |
| White Bluff | 6009_1 | Other | 900.0 MW | operational | Jefferson, Arkansas |
| Independence Steam Electric Station | 6641_1 | Other | 900.0 MW | operational | Independence, Arkansas |
| White Bluff EHV | J3874 | Gas | 770.0 MW | operational | Union, Arkansas |
| ETTA | J3829 | Gas | 770.0 MW | operational | Hot Spring, Arkansas |
| Plum Point Energy Station | 56456_STG1 | Other | 720.0 MW | operational | Mississippi, Arkansas |
| GEN-2000-006 | GEN-2000-006 | Gas | 660.0 MW | withdrawn | Fort Smith, Arkansas |
| GEN-2000-012 | GEN-2000-012 | Gas | 660.0 MW | withdrawn | Fort Smith, Arkansas |
| SHERIDAN EHV - MAGNET COVE 500.0kV | J4111 | Gas | 650.0 MW | withdrawn | Hot Spring, Arkansas |
| SWEPCO Tontitown 161kV Substation | GEN-2001-024 | Other | 630.0 MW | operational | Washington County, Arkansas |
| INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV | J2261 | Solar | 625.0 MW | operational | Jackson, Arkansas |
| MISO Queue Project S1161 — Generation in an unlisted county, Arkansas | S1161 | — | 625.0 MW | operational | Arkansas |
| INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV | J2262 | Solar | 625.0 MW | operational | Jackson, Arkansas |
| Turk 138kV | GEN-2006-010 | Other | 620.0 MW | operational | Hempstead Co., Arkansas |
| John W Turk Jr Power Plant | 56564_1 | Other | 609.0 MW | operational | Hempstead, Arkansas |
| GEN-2006-011 | GEN-2006-011 | Other | 605.0 MW | withdrawn | Hempstead Co., Arkansas |
| ETTA 500kV Substation | J2717 | Solar | 600.0 MW | withdrawn | Hot Spring, Arkansas |
| WEST MEMPHIS EHV - KEO EHV 500.0kV | J2477 | Solar | 600.0 MW | withdrawn | Crittenden, Arkansas |
| Arkansas Cypress Solar Station | 69989_PB1 | Solar | 600.0 MW | active | Jefferson, Arkansas |
| Flint Creek | 6138_1 | Other | 558.0 MW | operational | Benton, Arkansas |
| Lake Catherine | 170_4 | Gas | 552.5 MW | operational | Hot Spring, Arkansas |
| INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV | J2478 | Solar | 550.0 MW | withdrawn | Craighead, Arkansas |
| GEN-2006-007 | GEN-2006-007 | Gas | 530.0 MW | withdrawn | Washington Co., Arkansas |
| Sandy Bayou | J2696 | Solar | 500.0 MW | operational | Mississippi, Arkansas |
| Sheridan EHV- EL Dorado EHV 500 Kv | J2452 | Solar | 500.0 MW | withdrawn | Cleveland, Arkansas |
Top developers in Arkansas
Developer attribution is not yet resolved for this set.
Recent material changes
| Observed | Project | Field | Old | New |
|---|---|---|---|---|
| 2026-11-05 | Independent - Holland Bottom 500kV | withdrawn_date | — | 2026-10-20 |
| 2026-11-05 | Independent - Holland Bottom 500kV | status | operational | withdrawn |
| 2026-11-05 | MACEDONIA - TAYLOR 115.0kV | withdrawn_date | — | 2026-10-20 |
| 2026-11-05 | MACEDONIA - TAYLOR 115.0kV | status | operational | withdrawn |
| 2026-11-05 | Newport - Fisher 161 kV Line | withdrawn_date | — | 2026-10-20 |
| 2026-11-05 | Newport - Fisher 161 kV Line | status | operational | withdrawn |
| 2026-11-05 | CAMDEN MAGUIRE - SMACKOVER 115.0kV | withdrawn_date | — | 2026-10-20 |
| 2026-11-05 | CAMDEN MAGUIRE - SMACKOVER 115.0kV | status | operational | withdrawn |
| 2026-11-05 | AECC HUNTER NORTH - MCCRORY 161.0kV | withdrawn_date | — | 2026-10-20 |
| 2026-11-05 | AECC HUNTER NORTH - MCCRORY 161.0kV | status | operational | withdrawn |
| 2026-11-05 | BEEBE - GARNER SS 115.0kV | withdrawn_date | — | 2026-10-20 |
| 2026-11-05 | BEEBE - GARNER SS 115.0kV | status | operational | withdrawn |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-11-26
Page data generated2026-11-26
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.