2 Cedar Wind is a 180.0 MW other interconnection project in Fannin, Texas with a current status of operational. It is proposed to connect at Tap 345kV 1729 Valley South – Anna Switch 2373.

180.0 MWCapacity
OperationalStatus
FanninMarket
OtherTechnology

Project facts

Canonical name2 Cedar Wind
Queue ID28INR0286
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFannin
TechnologyOther
Capacity180.0 MW
StateTexas
CountyFannin
Point of interconnectionTap 345kV 1729 Valley South – Anna Switch 2373
Requested (queue) date2025-07-07
Proposed in-service date
Operational date2028-05-02
Withdrawn date
DeveloperSunWR, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata