Texas Interconnection Projects

interXdata tracks 6,848 interconnection projects in Texas representing 1,114,976 MW of requested capacity. The dominant technology by capacity is Solar. The most active counties are Harris, Brazoria, Carson.

6,848Total projects
873Active
4,686Operational
1,034Withdrawn
1,114,976 MWRequested capacity
160,617 MWActive capacity

Technology mix

TechnologyProjectsRequested capacity
Solar1,746357,908 MW
Other1,783276,283 MW
Gas1,799231,809 MW
Wind657135,163 MW
Battery800100,885 MW
Solar+Battery5111,412 MW
Wind+Battery5864 MW
Coal2465 MW
Oil3146 MW
Hydro127 MW
Nuclear113 MW

Counties

CountyProjectsRequested capacity
Harris41426,984 MW
Brazoria21028,589 MW
Carson17920,634 MW
Fort Bend15413,481 MW
Cameron15010,935 MW
Hidalgo14911,858 MW
Pecos13731,273 MW
Ector1199,735 MW
Wharton10923,264 MW
Bexar9811,591 MW
Bell889,006 MW
Galveston838,460 MW
Tarrant813,313 MW
Andrews766,515 MW
Nueces738,894 MW
Hill6814,624 MW
Webb6811,552 MW
Navarro6810,525 MW
Lamar6613,314 MW
Dallas664,679 MW
Matagorda6413,182 MW
Travis632,855 MW
Reeves6312,338 MW
San Patricio6312,049 MW
Victoria598,726 MW
Milam5914,599 MW
Scurry5811,455 MW
Starr549,323 MW
Ellis5410,226 MW
Collin522,567 MW
Upton5211,956 MW
Jefferson526,998 MW
Haskell5112,244 MW
Wilbarger5014,345 MW
Frio493,952 MW
Nolan499,204 MW
Borden4812,655 MW
Guadalupe477,616 MW
McLennan465,501 MW
Ward436,530 MW

Largest projects

ProjectQueue IDTechnologyCapacityStatusLocation
GEN-2008-031GEN-2008-031Wind4,000.0 MWwithdrawnWilbarger County, Texas
PC3000GQ26-LG-3-26-4Gas3,000.0 MWactiveEl Paso County, Texas
Brazos Energy Security28INR0456Gas3,000.0 MWoperationalFisher, Texas
BM Great Rock Energy Center30INR0091Gas1,981.2 MWoperationalLeon, Texas
Prairie Ridge (Gas - CC)30INR0071Gas1,660.4 MWoperationalFranklin, Texas
Hecate Energy Orem Wind27INR0061Other1,542.0 MWoperationalBrazoria, Texas
Aegle Power27INR0084Gas1,536.4 MWoperationalCameron, Texas
Big Canyon Wind30INR0018Other1,500.0 MWoperationalPecos, Texas
Caldwell County Energy Center30INR0031Gas1,500.0 MWoperationalCaldwell, Texas
Bullock Gas33INR0005Gas1,400.0 MWoperationalHill, Texas
Liberty Thermal Energy Center33INR0006Gas1,400.0 MWoperationalHill, Texas
South Texas Project6251_2Other1,354.3 MWoperationalMatagorda, Texas
South Texas Project6251_1Other1,354.3 MWoperationalMatagorda, Texas
Pirkey 345 kV SubstationGEN-2024-377Gas1,350.0 MWoperationalHarrison, Texas
BasRanch (TEF - Due Diligence)25INR0008Gas1,350.0 MWoperationalWard, Texas
STP Unit2 High Pressure Turbine Upgrade27INR0557Other1,336.5 MWoperationalMatagorda, Texas
Blue Energy Center - Phase 3 – Steam Stage 233INR0007Other1,320.0 MWactiveVictoria, Texas
Moon Hammer30INR0077Gas1,300.0 MWoperationalWheeler, Texas
The Giant Arc I30INR0113Gas1,300.0 MWoperationalPecos, Texas
The Giant Arc-II30INR0105Gas1,300.0 MWoperationalPecos, Texas
Willow Oak Gas30INR0020Gas1,298.0 MWoperationalJefferson, Texas
Sandow Lakes Energy Station27INR0071Gas1,291.6 MWoperationalMilam, Texas
Aurelius 3 Natural Gas29INR0361Gas1,275.0 MWoperationalDeaf Smith, Texas
Jewett Energy Center 1 Gas29INR0150Gas1,274.0 MWoperationalFreestone, Texas
Thunder Bird 1 Gas30INR0110Gas1,272.8 MWactiveJack, Texas
Thunder Bird 2 Gas28INR0509Gas1,272.8 MWoperationalJack, Texas
Mule Deer Run Gas32INR0003Gas1,263.0 MWoperationalAnderson, Texas
Mule Deer Run Gas III31INR0022Gas1,263.0 MWoperationalAnderson, Texas
Mule Deer Run Gas II31INR0021Gas1,263.0 MWoperationalAnderson, Texas
NRG Prairie Energy Center29INR0158Gas1,253.0 MWoperationalHill, Texas

Top developers in Texas

Recent material changes

ObservedProjectFieldOldNew
2026-11-25Kress 115 kV Substationproposed_online_date2030-12-312031-05-01
2026-11-20Winnsboro 138 kV Substationproposed_online_date2029-04-192029-10-15
2026-11-17Pirkey - Whitney 138 kV Lineproposed_online_date2028-03-312029-12-31
2026-11-17Hansford 115kVwithdrawn_date—2026-10-30
2026-11-17Hansford 115kVstatusactivewithdrawn
2026-11-12TUCO-Oklaunion 345kVproposed_online_date2026-10-152027-11-15
2026-11-09To199SB_2phaseN/ACluster Study, Facilities Study
2026-11-09To199SB_1phaseN/ACluster Study, Facilities Study
2026-11-09Ea150BphaseN/ACluster Study, Facilities Study
2026-11-09Sf150SBproposed_online_date2027-05-012027-11-10
2026-11-05Cypress 138 kV Substationwithdrawn_date—2026-10-20
2026-11-05Cypress 138 kV Substationstatusoperationalwithdrawn

Explore related data

Source last checked2026-07-31
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); epe-oasis; ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.