200 MW Data Center Load (L0658)

200 MW Data Center Load is a 200.0 MW other interconnection project with a current status of active. It is proposed to connect at Ponderosa-Pilot Butte 230 kV No 1 line Ponderosa-Corral 230 kV No line.

200.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical name200 MW Data Center Load
Queue IDL0658
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity200.0 MW
State
CountyCrook
Point of interconnectionPonderosa-Pilot Butte 230 kV No 1 line Ponderosa-Corral 230 kV No line
Requested (queue) date2025-07-15
Proposed in-service date2029-01-01
Operational date
Withdrawn date
DeveloperCentral Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata