Central Electric Cooperative, Inc. — Interconnection Portfolio

Central Electric Cooperative, Inc. is associated with 13 tracked interconnection projects representing 1,427 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

13Projects
6Active
0Operational
7Withdrawn
1,427 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other131,427 MW

Geographic footprint

StateProjects
Oregon9

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
300 MW Data Center Load Served from GrizzlyL0650Other300.0 MWactiveJefferson, —
BonanzaL0543Other300.0 MWactiveCrook, Oregon
200 MW Data Center LoadL0658Other200.0 MWactiveCrook, —
200 MW Data Center, Phase 2L0662Other200.0 MWactiveCrook, —
CEC POD at PonderosaL0331Other100.0 MWwithdrawnCrook, Oregon
Baldwin Data CenterL0332Other70.0 MWwithdrawnCrook, Oregon
Bonanza 115 kVL0588Other50.0 MWactiveCrook, Oregon
Redmond 69 kV to 115 kVL0632Other50.0 MWactiveDeschutes, —
SW Highland AveL0486Other40.0 MWwithdrawnCrook, Oregon
New LoadL0403Other40.0 MWwithdrawnCrook, Oregon
Project MaverickL0335Other31.0 MWwithdrawnCrook, Oregon
Hidden CanyonL0589Other23.0 MWwithdrawnCrook, Oregon
Big Eddy-Redmond 230kV LineL0345Other22.9 MWwithdrawnWasco, Oregon

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Monitor Central Electric Cooperative, Inc.'s portfolio across all markets.

Start tracking with interXdata