200 MW Data Center, Phase 2 (L0662)

200 MW Data Center, Phase 2 is a 200.0 MW other interconnection project with a current status of active. It is proposed to connect at Ponderosa-Pilot Butte 230 kV No 1 line, Ponderosa-Corral 230 kV No line.

200.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical name200 MW Data Center, Phase 2
Queue IDL0662
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity200.0 MW
State
CountyCrook
Point of interconnectionPonderosa-Pilot Butte 230 kV No 1 line, Ponderosa-Corral 230 kV No line
Requested (queue) date2025-08-01
Proposed in-service date2028-08-04
Operational date
Withdrawn date
DeveloperCentral Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata