200 MW Data Center, Phase 2 (L0662)
200 MW Data Center, Phase 2 is a 200.0 MW other interconnection project with a current status of active. It is proposed to connect at Ponderosa-Pilot Butte 230 kV No 1 line, Ponderosa-Corral 230 kV No line.
200.0 MWCapacity
ActiveStatus
—Market
OtherTechnology
Project facts
| Canonical name | 200 MW Data Center, Phase 2 |
|---|---|
| Queue ID | L0662 |
| Status | active |
| Source status | STUDY |
| Market | — |
| Technology | Other |
| Capacity | 200.0 MW |
| State | — |
| County | Crook |
| Point of interconnection | Ponderosa-Pilot Butte 230 kV No 1 line, Ponderosa-Corral 230 kV No line |
| Requested (queue) date | 2025-08-01 |
| Proposed in-service date | 2028-08-04 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Central Electric Cooperative, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.