2081 Terzian Solar Project (58918_2081)

2081 Terzian Solar Project is a 1.2 MW solar interconnection project in Fresno, California with a current status of operational.

1.2 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical name2081 Terzian Solar Project
Queue ID58918_2081
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity1.2 MW
StateCalifornia
CountyFresno
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2014-02-01
Withdrawn date—
Developer—
Utility / transmission ownerSolarenewal LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata