230 kV Rolling Hills Substation (GEN-2022-133)

230 kV Rolling Hills Substation is a 250.0 MW battery interconnection project in Potter, Texas with a current status of withdrawn. It is proposed to connect at 230 kV Rolling Hills Substation.

250.0 MWCapacity
WithdrawnStatus
TXMarket
BatteryTechnology

Project facts

Canonical name230 kV Rolling Hills Substation
Queue IDGEN-2022-133
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyBattery
Capacity250.0 MW
StateTexas
CountyPotter
Point of interconnection230 kV Rolling Hills Substation
Requested (queue) date2023-02-21
Proposed in-service date2027-12-31
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata