2400 controllable ETU - unidirectional (1333)

2400 controllable ETU - unidirectional is a 1,100.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at 1. Singer 345kV Substation existing available circuit breaker position and new circuit breaker position. 2. Offshore platform at the MA/RI BOEM Wind Energy Areas.

1,100.0 MWCapacity
WithdrawnStatus
SWCTMarket
GenerationTechnology

Project facts

Canonical name2400 controllable ETU - unidirectional
Queue ID1333
Statuswithdrawn
Source statusW
MarketSWCT
TechnologyGeneration
Capacity1,100.0 MW
StateConnecticut
County
Point of interconnection1. Singer 345kV Substation existing available circuit breaker position and new circuit breaker position. 2. Offshore platform at the MA/RI BOEM Wind Energy Areas
Requested (queue) date2022-11-08
Proposed in-service date2028-05-31
Operational date
Withdrawn date2024-01-30
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata