2W Permian Solar Project Hybrid (63255_2WPSO)
2W Permian Solar Project Hybrid is a 420.0 MW solar interconnection project in Andrews, Texas with a current status of operational.
420.0 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology
Project facts
| Canonical name | 2W Permian Solar Project Hybrid |
|---|---|
| Queue ID | 63255_2WPSO |
| Status | operational |
| Source status | (OP) Operating |
| Market | ERCO |
| Technology | Solar |
| Capacity | 420.0 MW |
| State | Texas |
| County | Andrews |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2021-08-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | 2W Permian Solar, LLC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.