315 Vinson Road (63979_VINSN)

315 Vinson Road is a 2.0 MW solar interconnection project in Johnston, North Carolina with a current status of operational.

2.0 MWCapacity
OperationalStatus
CPLEMarket
SolarTechnology

Project facts

Canonical name315 Vinson Road
Queue ID63979_VINSN
Statusoperational
Source status(OP) Operating
MarketCPLE
TechnologySolar
Capacity2.0 MW
StateNorth Carolina
CountyJohnston
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2020-12-01
Withdrawn date—
Developer—
Utility / transmission ownerRed Toad 315 Vinson Road, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata