34.5kV Substation. Nearest transmission bus: 115kV Bluejay (AFS NJG-2026-003)
34.5kV Substation. Nearest transmission bus: 115kV Bluejay is a 6.0 MW gas interconnection project in Cimarron, Kansas with a current status of operational. It is proposed to connect at 34.5kV Substation. Nearest transmission bus: 115kV Bluejay.
6.0 MWCapacity
OperationalStatus
KSMarket
GasTechnology
Project facts
| Canonical name | 34.5kV Substation. Nearest transmission bus: 115kV Bluejay |
|---|---|
| Queue ID | AFS NJG-2026-003 |
| Status | operational |
| Source status | — |
| Market | KS |
| Technology | Gas |
| Capacity | 6.0 MW |
| State | Kansas |
| County | Cimarron |
| Point of interconnection | 34.5kV Substation. Nearest transmission bus: 115kV Bluejay |
| Requested (queue) date | 2025-10-31 |
| Proposed in-service date | — |
| Operational date | 2026-12-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SPEC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-19 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.