345 kV Crab Orchard Substation is a 250.0 MW solar interconnection project in Williamson, Illinois with a current status of operational. It is proposed to connect at 345 kV Crab Orchard Substation.

250.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical name345 kV Crab Orchard Substation
Queue IDJ2267
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity250.0 MW
StateIllinois
CountyWilliamson
Point of interconnection345 kV Crab Orchard Substation
Requested (queue) date2022-03-24
Proposed in-service date2025-03-31
Operational date2025-03-31
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata