345 kV Walton Substation (J1680)

345 kV Walton Substation is a 100.0 MW solar interconnection project in Cass, Indiana with a current status of withdrawn. It is proposed to connect at 345 kV Walton Substation.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical name345 kV Walton Substation
Queue IDJ1680
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateIndiana
CountyCass
Point of interconnection345 kV Walton Substation
Requested (queue) date2020-06-24
Proposed in-service date2023-04-20
Operational date2023-04-20
Withdrawn date2024-09-03
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata