3Colton (66320_3COLT)

3Colton is a 3.4 MW solar interconnection project in Worcester, Massachusetts with a current status of operational.

3.4 MWCapacity
OperationalStatus
ISNEMarket
SolarTechnology

Project facts

Canonical name3Colton
Queue ID66320_3COLT
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologySolar
Capacity3.4 MW
StateMassachusetts
CountyWorcester
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-07-01
Withdrawn date—
Developer—
Utility / transmission ownerMadison Energy Investments LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata