4HARCO - 4MUDDY 138.0kV (J3916)

4HARCO - 4MUDDY 138.0kV is a 100.0 MW solar interconnection project in Saline, Illinois with a current status of operational. It is proposed to connect at 4HARCO - 4MUDDY 138.0kV.

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical name4HARCO - 4MUDDY 138.0kV
Queue IDJ3916
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity100.0 MW
StateIllinois
CountySaline
Point of interconnection4HARCO - 4MUDDY 138.0kV
Requested (queue) date2024-10-25
Proposed in-service date2030-09-02
Operational date2030-09-02
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.