4SIDNEY 1 - 4MIRA TAP 138.0kV (J1970)

4SIDNEY 1 - 4MIRA TAP 138.0kV is a 160.0 MW solar interconnection project in Champaign, Illinois with a current status of withdrawn. It is proposed to connect at 4SIDNEY 1 - 4MIRA TAP 138.0kV.

160.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical name4SIDNEY 1 - 4MIRA TAP 138.0kV
Queue IDJ1970
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity160.0 MW
StateIllinois
CountyChampaign
Point of interconnection4SIDNEY 1 - 4MIRA TAP 138.0kV
Requested (queue) date2022-03-23
Proposed in-service date2025-10-01
Operational date2025-10-01
Withdrawn date2025-12-18
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata