500MW Snohomish (G19)

500MW Snohomish is a 500.0 MW gas interconnection project in Snohomish, Washington with a current status of withdrawn. It is proposed to connect at At 115 kV and 230 kV Snohomish Substation.

500.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology

Project facts

Canonical name500MW Snohomish
Queue IDG19
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyGas
Capacity500.0 MW
StateWashington
CountySnohomish
Point of interconnectionAt 115 kV and 230 kV Snohomish Substation
Requested (queue) date2001-01-18
Proposed in-service date2002-09-01
Operational date
Withdrawn date
DeveloperFPL
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata