7.5 Miles City to Dawson 230 kV Line (GEN-2022-220)

7.5 Miles City to Dawson 230 kV Line is a 250.0 MW solar interconnection project in Stark, North Dakota with a current status of withdrawn. It is proposed to connect at 7.5 Miles City to Dawson 230 kV Line.

250.0 MWCapacity
WithdrawnStatus
NDMarket
SolarTechnology

Project facts

Canonical name7.5 Miles City to Dawson 230 kV Line
Queue IDGEN-2022-220
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologySolar
Capacity250.0 MW
StateNorth Dakota
CountyStark
Point of interconnection7.5 Miles City to Dawson 230 kV Line
Requested (queue) date2023-03-02
Proposed in-service date2026-05-30
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata