7CASEY - 7NEWTON 345.0kV (J2922)

7CASEY - 7NEWTON 345.0kV is a 250.0 MW solar interconnection project in Jasper, Illinois with a current status of withdrawn. It is proposed to connect at 7CASEY - 7NEWTON 345.0kV.

250.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical name7CASEY - 7NEWTON 345.0kV
Queue IDJ2922
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity250.0 MW
StateIllinois
CountyJasper
Point of interconnection7CASEY - 7NEWTON 345.0kV
Requested (queue) date2022-09-14
Proposed in-service date2028-04-01
Operational date2028-04-01
Withdrawn date2026-10-20
Developer—
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-05withdrawn_date—2026-10-20high
2026-11-05statusoperationalwithdrawnhigh
2026-10-31phasePhase 2Phase 3low
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-28
Data last materially changed2026-11-28
Page data generated2026-11-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata