7CASEY - 7NEWTON 345.0kV (J3995)

7CASEY - 7NEWTON 345.0kV is a 300.0 MW wind interconnection project in Jasper, Illinois with a current status of withdrawn. It is proposed to connect at 7CASEY - 7NEWTON 345.0kV.

300.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical name7CASEY - 7NEWTON 345.0kV
Queue IDJ3995
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity300.0 MW
StateIllinois
CountyJasper
Point of interconnection7CASEY - 7NEWTON 345.0kV
Requested (queue) date2025-04-23
Proposed in-service date2030-07-01
Operational date2030-07-01
Withdrawn date2026-01-05
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata