7CASEY - 7SNYDER 345.0kV (J3695)

7CASEY - 7SNYDER 345.0kV is a 150.0 MW battery interconnection project in Clark, Illinois with a current status of operational. It is proposed to connect at 7CASEY - 7SNYDER 345.0kV.

150.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical name7CASEY - 7SNYDER 345.0kV
Queue IDJ3695
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity150.0 MW
StateIllinois
CountyClark
Point of interconnection7CASEY - 7SNYDER 345.0kV
Requested (queue) date2024-04-18
Proposed in-service date2028-09-30
Operational date2028-09-30
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata