7COFFEEN - 7ROXFORD 345.0kV (J3751)

7COFFEEN - 7ROXFORD 345.0kV is a 236.0 MW wind interconnection project in Madison, Illinois with a current status of withdrawn. It is proposed to connect at 7COFFEEN - 7ROXFORD 345.0kV.

236.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical name7COFFEEN - 7ROXFORD 345.0kV
Queue IDJ3751
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity236.0 MW
StateIllinois
CountyMadison
Point of interconnection7COFFEEN - 7ROXFORD 345.0kV
Requested (queue) date2024-04-18
Proposed in-service date2028-10-31
Operational date2028-10-31
Withdrawn date2025-12-23
Developer—
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-24phaseStudy Not StartedPhase 2low
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.