7FARGO - 7SANDBURG 345.0kV (J3860)

7FARGO - 7SANDBURG 345.0kV is a 500.0 MW wind interconnection project in Peoria, Illinois with a current status of operational. It is proposed to connect at 7FARGO - 7SANDBURG 345.0kV.

500.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical name7FARGO - 7SANDBURG 345.0kV
Queue IDJ3860
Statusoperational
Source statusActive
Market
TechnologyWind
Capacity500.0 MW
StateIllinois
CountyPeoria
Point of interconnection7FARGO - 7SANDBURG 345.0kV
Requested (queue) date2025-01-27
Proposed in-service date2030-04-02
Operational date2030-04-02
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.