7JORD - 7MASS 345.0kV (J3379)

7JORD - 7MASS 345.0kV is a 100.0 MW solar interconnection project in Johnson, Illinois with a current status of operational. It is proposed to connect at 7JORD - 7MASS 345.0kV.

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical name7JORD - 7MASS 345.0kV
Queue IDJ3379
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity100.0 MW
StateIllinois
CountyJohnson
Point of interconnection7JORD - 7MASS 345.0kV
Requested (queue) date2024-04-18
Proposed in-service date2028-02-18
Operational date2028-02-18
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.