7L Solar SLF (29INR0107)

7L Solar SLF is a 71.6 MW solar interconnection project in Dimmit, Texas with a current status of operational. It is proposed to connect at Tap 69kV 5870 Brundage - 5868 Big Wells.

71.6 MWCapacity
OperationalStatus
DimmitMarket
SolarTechnology

Project facts

Canonical name7L Solar SLF
Queue ID29INR0107
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketDimmit
TechnologySolar
Capacity71.6 MW
StateTexas
CountyDimmit
Point of interconnectionTap 69kV 5870 Brundage - 5868 Big Wells
Requested (queue) date2025-09-22
Proposed in-service date
Operational date2029-11-13
Withdrawn date
Developer7L Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata