7Pana-7Austin 345kV (J2790)

7Pana-7Austin 345kV is a 300.0 MW battery interconnection project in Christian, Illinois with a current status of withdrawn. It is proposed to connect at 7Pana-7Austin 345kV.

300.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical name7Pana-7Austin 345kV
Queue IDJ2790
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity300.0 MW
StateIllinois
CountyChristian
Point of interconnection7Pana-7Austin 345kV
Requested (queue) date2022-09-14
Proposed in-service date2026-02-05
Operational date2026-02-05
Withdrawn date2023-03-13
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.