7XENIA - 7MTVERNW 345.0kV (J2033)

7XENIA - 7MTVERNW 345.0kV is a 200.0 MW solar interconnection project in Clay, Illinois with a current status of operational. It is proposed to connect at 7XENIA - 7MTVERNW 345.0kV.

200.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical name7XENIA - 7MTVERNW 345.0kV
Queue IDJ2033
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity200.0 MW
StateIllinois
CountyClay
Point of interconnection7XENIA - 7MTVERNW 345.0kV
Requested (queue) date2021-08-26
Proposed in-service date2024-04-15
Operational date2024-04-15
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata