819 HANFORD SOLAR I (862)

819 HANFORD SOLAR I is a 5.0 MW solar interconnection project in Kings, California with a current status of withdrawn. It is proposed to connect at PG&E Armstrong 70kV switching station at intersection of S 11th Ave. and Idaho Avenue, Hanford, CA..

5.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical name819 HANFORD SOLAR I
Queue ID862
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity5.0 MW
StateCalifornia
CountyKings
Point of interconnectionPG&E Armstrong 70kV switching station at intersection of S 11th Ave. and Idaho Avenue, Hanford, CA.
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2012-08-17
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata