Abeja Solar Farm (68347_ABPV1)

Abeja Solar Farm is a 200.0 MW solar interconnection project in Bee, Texas with a current status of active.

200.0 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameAbeja Solar Farm
Queue ID68347_ABPV1
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketERCO
TechnologySolar
Capacity200.0 MW
StateTexas
CountyBee
Point of interconnection—
Requested (queue) date—
Proposed in-service date2028-07-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAbeja Solar Farm LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02proposed_online_date2027-07-012028-07-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.