AC IL - Lockport West (70228_LOCKW)

AC IL - Lockport West is a 3.4 MW solar interconnection project in Will, Illinois with a current status of active.

3.4 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameAC IL - Lockport West
Queue ID70228_LOCKW
Statusactive
Source status(TS) Construction complete, but not yet in commercial operation
MarketPJM
TechnologySolar
Capacity3.4 MW
StateIllinois
CountyWill
Point of interconnection
Requested (queue) date
Proposed in-service date2026-08-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerStandard Solar

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata