Acton-Boxborough Schools BESS (66966_ABRSD)

Acton-Boxborough Schools BESS is a 2.1 MW battery interconnection project in Middlesex, Massachusetts with a current status of operational.

2.1 MWCapacity
OperationalStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical nameActon-Boxborough Schools BESS
Queue ID66966_ABRSD
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyBattery
Capacity2.1 MW
StateMassachusetts
CountyMiddlesex
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-05-01
Withdrawn date—
Developer—
Utility / transmission ownerMSS Energy Holdings, LLC (d.b.a. Calibrant Energy)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.