Adams 138kV (AB2-085)

Adams 138kV is a 49.9 MW solar interconnection project in Adams, Ohio with a current status of withdrawn.

49.9 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameAdams 138kV
Queue IDAB2-085
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity49.9 MW
StateOhio
CountyAdams
Point of interconnection—
Requested (queue) date2016-04-18
Proposed in-service date2023-12-31
Operational date—
Withdrawn date2025-03-26
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata