Adams substation at 69 kV (J522)

Adams substation at 69 kV is a 20.0 MW battery interconnection project in Mower County, Minnesota with a current status of withdrawn. It is proposed to connect at Adams substation at 69 kV.

20.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameAdams substation at 69 kV
Queue IDJ522
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity20.0 MW
StateMinnesota
CountyMower County
Point of interconnectionAdams substation at 69 kV
Requested (queue) date2015-11-16
Proposed in-service date2019-09-15
Operational date2019-09-15
Withdrawn date2019-04-09
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.