Adams Wind Farm (56307_2)

Adams Wind Farm is a 9.8 MW wind interconnection project in Mower, Minnesota with a current status of operational.

9.8 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameAdams Wind Farm
Queue ID56307_2
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity9.8 MW
StateMinnesota
CountyMower
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2004-07-01
Withdrawn date—
Developer—
Utility / transmission ownerJustin McNeilus

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata