Adamstown Solar (21INR0210)

Adamstown Solar is a 250.9 MW solar interconnection project in Wilbarger, Texas with a current status of operational. It is proposed to connect at tap 345kV 1730 West Krum - 6111 Riley Ckt 2.

250.9 MWCapacity
OperationalStatus
WilbargerMarket
SolarTechnology

Project facts

Canonical nameAdamstown Solar
Queue ID21INR0210
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketWilbarger
TechnologySolar
Capacity250.9 MW
StateTexas
CountyWilbarger
Point of interconnectiontap 345kV 1730 West Krum - 6111 Riley Ckt 2
Requested (queue) date2018-11-20
Proposed in-service date
Operational date2027-08-31
Withdrawn date
DeveloperAdams Creek Solar Project, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata