AECC Manila - Dell EHV 161 kV (J2089 POI) (J2522)

AECC Manila - Dell EHV 161 kV (J2089 POI) is a 100.0 MW battery interconnection project in Mississippi, Arkansas with a current status of withdrawn. It is proposed to connect at AECC Manila - Dell EHV 161 kV (J2089 POI).

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameAECC Manila - Dell EHV 161 kV (J2089 POI)
Queue IDJ2522
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateArkansas
CountyMississippi
Point of interconnectionAECC Manila - Dell EHV 161 kV (J2089 POI)
Requested (queue) date2022-09-13
Proposed in-service date2026-10-31
Operational date2026-10-31
Withdrawn date2023-03-25
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.