AES Parkdale Storage (16INR0120)

AES Parkdale Storage is a 20.0 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at PARK_1T8 138kV bus (## 2440).

20.0 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameAES Parkdale Storage
Queue ID16INR0120
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity20.0 MW
State
County
Point of interconnectionPARK_1T8 138kV bus (## 2440)
Requested (queue) date2015-10-04
Proposed in-service date2017-10-31
Operational date
Withdrawn date
DeveloperAES DE DEVCO NC LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata