AIR STATION 1 (1568)
AIR STATION 1 is a 40.0 MW solar+battery interconnection project in Kings, California with a current status of active. It is proposed to connect at Henrietta-Lemoore NAS 70 kV.
40.0 MWCapacity
ActiveStatus
FresnoMarket
Solar+BatteryTechnology
Project facts
| Canonical name | AIR STATION 1 |
|---|---|
| Queue ID | 1568 |
| Status | active |
| Source status | ACTIVE |
| Market | Fresno |
| Technology | Solar+Battery |
| Capacity | 40.0 MW |
| State | California |
| County | Kings |
| Point of interconnection | Henrietta-Lemoore NAS 70 kV |
| Requested (queue) date | 2019-04-15 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PGAE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata