Airport 1 Solar (DIA) (59807_GBDIA)

Airport 1 Solar (DIA) is a 1.5 MW solar interconnection project in Adams, Colorado with a current status of operational.

1.5 MWCapacity
OperationalStatus
SWPPMarket
SolarTechnology

Project facts

Canonical nameAirport 1 Solar (DIA)
Queue ID59807_GBDIA
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologySolar
Capacity1.5 MW
StateColorado
CountyAdams
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2009-12-01
Withdrawn date—
Developer—
Utility / transmission ownerCleanCapital Holdings

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.